Solar Power Plant “Gobem” of 9.45 MW to Be Built in Temerin
Source: eKapija
Wednesday, 09.02.2022.
10:51


Illustration (Photo: Shutterstock)

The investor in the solar power plant is the eponymous company from Belgrade, and the project was prepared by Lamda Group d.o.o. Novi Sad.
The power plant with a power of 9,450 kW, that is, 9.45 MW, with 105 inverters, will be built in the business zone within the construction settlement of Temerin.
The solar power plant will be connected to the power distribution system and transfer electricity to the DSEE system (electrical energy distribution system) in full, aside from the power plant’s own consumption, the document says.
B. P.
Tags:
Municipality of Temerin
Gobem doo Belgrade
Lamda group doo Novi Sad
solar power plant Gobem
construction
urban project
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.