Track Recording Car for Belgrade-Novi Sad Railway Arrives from Germany, Testing to Start
Source: Tanjug
Tuesday, 18.01.2022.
12:29


Illustration (Photo: bibiphoto/shutterstock)

Along with the track recording car, two train engines for speeds of up to 230 km/h have also arrived from Germany to the Belgrade Center station in Prokop.
Nenad Stanisavljevic of the Serbian Railways Infrastructure told Tanjug that the dynamic testing entailed the testing of the geometry of the newly built tracks for high speeds, the parameters of the overhead contact network, the installed equipment for high speeds, equipment and system compatibility, as well as the other executed engineering works.
The dynamic testing on the railway for speeds of up to 200 km/h between Belgrade and Novi Sad will last until February 4 and will be carried out between 6.30 AM and 5.30 PM without train traffic.
The dynamic testing of the newly built fast railway will be carried out by the company Serbian Railways Infrastructure with the specialized company of Deutsche Bahn, Systemtechnik, which has been hired for the realization of this job.
The testing will be done in phases and by section along the entire Belgrade-Novi Sad fast railway.
Companies:

Tags:
Deutsche Bahn
Systemtechnik
Nenad Stanisavljević
Belgrade Novi Sad fast railway
Belgrade Center railway station
Prokop
track recording car
dynamic railway testing
locomotives
train engines
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.