Begej River Opening its Water Gates After 65 Years
The Begej in Zrenjanin (Photo: Aktron / Wikimedia Commons)

Rehabilitated with the funds of the European Union, through the international Romanian-Serbian cross-border project, called “The Repair of the Navigation Infrastructure on the Begej Canal”, the gates in Sanmartinu Maghiar, a Romanian settlement on the Begej, have let through the first boat, which, when the hydrotechnical hubs Klek and Srpski Itebej are repaired, will sail down the Begej through Serbia as well.
The history of the Begej Canal begins in 1728, when it was built. For over 200 years, it was the main link of the Banat areas in Romania and Serbia. During World War 2, numerous navigation lock facilities were damaged, and the tense socioeconomic situation in the region and the communist regimes severed the water link between the neighboring states in 1958.
Now, more than 200 years after the establishment of the Begej Canal, with the repair of hydrotechnical hubs, wider possibilities for trade and tourism in this part of Europe will open and the good neighborly cooperation between Romania and Serbia will be promoted in the most beautiful way.
Tags:
Sanmartinu Maghiar
Klek
Srpski Itebej
Begej
Begej Canal
water gates
Romanian Serbian cross border project
repair of navigation infrastructure on Begej Canal
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.