At Subotica, 5 kilometers of Ipsilon arm at Corridor 10 put into traffic operations
Source: Beta/Tanjug
Wednesday, 23.08.2017.
14:53


Illustration (Photo: Rajko Karišić)

- We completed 6.5 kilometers of road in 10 months, and the objective is that in 2019 we built entire Ipsilon arm, i.e. a roundabout around Subotica which will connect the border crossings Horgos and Kelebija and will contribute to thousands of trucks passing daily through the city to be diverted to new road – Mihajlovic said, adding that with the end of the Ipsilon arm, industrial zone in Subotica will be directly connected with Corridor 10.
- We cannot talk about development of Subotica, Vojvodina and Serbia if we do not have infrastructure and the Ministry I run will work on it next year - to connect the whole Serbia with highways, regional roads and reconstructed local roads – Mihajlovic concluded.
Contractor of works on this section is a consortium of companies headed by Subotica-based Vojput and the value of works is RSD 337,7 m with VAT.
Mihajlovic reminded that the part of the Ipsilon arm was released for traffic in March this year, so that in 10 months 6.5 km were put into traffic.Activities on the construction of the bypass have been launched nearly 30 years ago.
Companies:


Tags:
Corridor 10
Ipsilon arm
section Ipsilon arm at Corridor 10
at Subotica
roundabout at Subotica
industrial zone Subotica
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.