Kosevi Interchange Near Krusevac to Also Be Built on Morava Corridor – Roads of Serbia Looking for Designer
Source: eKapija
Tuesday, 22.11.2022.
15:44


Illustration (Photo: Shimon Bar/shutterstock.com)

According to the project task, the reason for preparing the urban project and the feasibility study with the preliminary design for the construction of the Kosevi interchange on the Morava Corridor is the creation of the conditions for the improvement and a more detailed approach to designing the traffic connection of the IB-grade state road no. 23 with the future IA-grade state road A5 (E-761) and the western part of Serbia with the country’s east and south.
It is added that, within the interchange, toll collection structures need to be planned, because a closed toll collection system will be implemented on the Pojate-Preljina (Morava Corridor) highway section.
Read more:
The project documentation should also envisage the works on the expansion of the highway in order to form suitable merging and diverging lanes and plan merging and diverging ramps for the connecting of the highway with the state road no. 23.
The value of the job is RSD 20.8 million, and the tender expires on December 15.
More details can be found HERE.
B. P.
Companies:

Tags:
Morava Corridor
Pojate Preljina highway
E761 highway
state road 23
Koševi interchange
construction of a traffic interchange
designing an interchange
Comments
Your comment
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.